Cables de fibra óptica a través de un pozo vertical
Sinohydro | Israel | 2021
The Challenge
At NEMISA underground mine, groundwater levels were rising, interrupting production and avoiding continuity and exploration in the mine.
Taking into account the complex topography and depth of the mine, where the water was at 700 meters depth, a pumping system which could work at high pressures to move the water through pools at different mine levels. The slopes inside the mine ranged between 40° and 90°.
The challenge was to find a pipe with high pressure resistance as well as high flexibility, since the pipes had to cross cesspits. The NEMISA engineering team evaluated different options for the pipe material:
Pexgol Solution
After choosing the PE-X for the drainage line, Pexgol supplied 4400 meters of coiled pipe. Part of the coils were deployed inside the mine through cesspits. The other part was deployed outside the mine, and the pipes were dragged by a truck hundreds of meters to the point of installation.
The installation required very few connections, and the operators of the plant were very satisfied with the speed and ease of installation of the Pexgol system. The connections were made with flanged couplings and did not require special tools.
It was not necessary to install any kind of pipe supports, the mine ramps were used as existing supports.
NEMISA was very satisfied and decided to continue using Pexgol for other dewatering applications.
Client
NEMISA Mine
Mexico | 2018
Working Conditions:
Pressure between 15 and 30 bar, temperature at 40°C
Pexgol Pipes
Pexgol 120 mm (4”), Class 15, 24 & 30
Application:
Underground Mine Dewatering
Length:
4430 m