Cables de fibra óptica a través de un pozo vertical
Sinohydro | Israel | 2021
The Challenge
Tizapa Mine formerly installed an HDPE line were they used to transport slurry. This pipe suffered several failures on the joints, so did the thermo-fusions and the stub-ends as well.
They determinate that the failures were caused by small water hammers on the line.
The Solution
Due to this special circumstances, Tizapa Mine decided to install Pexgol pipes for the following reasons:
Customer:
Tizapa Mine
Mexico | 2015
Working conditions:
Pressure 100 Psi; Flow 225 mД/h;
Specific Weight 1.2 t; Solids 20-30%.
Pipes used:
Pexgol 10” 250 mm, Class 15 (SDR 11).
Application:
Slurry transportation.
Length:
200 meters.