Cables de fibra óptica a través de un pozo vertical
Sinohydro | Israel | 2021
The Challenge
The high pressure and corrosion caused constant failure of the two initial parallel steel pipelines and serious threats to the production process.
One steel pipeline was out of service for at least two years and the other suffered from severe corrosion. Since this was the only main line transporting water to the production line, it was critical for the whole production process. The client required a highly durable and a quick install solution for non-stop performance
The Solution
The replacement of the steel pipeline with Pexgol’s flexible and high resistance to corrosion pipe solution eliminated previous failures. In addition, Pexgol supplied easy-to-install longer pipes.
The client is so pleased with the solution that he will be replacing the HDPE pipes that are part of this line as well.
Customer:
Yamana Gold, Meridian Mine
Chile | 2012
Working conditions:
High pressure (over 24 bar), corrosion and ambient temperature at 40°C/104°F.
The first 2,750 meters of pipes were covered in sand, the last 2,750 meters were exposed to the sun.
Pipes used:
Pexgol 225×30.8, Class 24.
Application:
Dewatering.
Length:
5,500 meters.